- Reviewed fuel filter change and fuel bleed procedure
- Worked on auxiliary systems fuel tank mounting design
- Refreshed memory on how to:
- Adjust max governed RPM
- Advance engine injection timing
- Increase injection pump fuel delivery
- Reviewed engine pre-heater controller options
- Removed engine components to gain access to fuel filters
- Removed old fuel primer pump
- Installed new fuel primer pump
- Replaced both fuel filters
- Bled fuel system
- Reassembled removed engine components
- Ran engine and checked for leaks
- Tested out variety of way to access engine pump adjustment
- Inspected air filter (nice and clean)
- Trimmed interfering material away from gray water tank hold down
- Prepped and primed gray water tank hold down
- Seam sealed gray water tank hold down
- Painted gray water tank hold down
- Ordered gray water tank fittings
- Reviewed heater and pre-heater fuel line hardware
- Reviewed electric air compressor wiring
- Reviewed pre-heater wiring
- Reviewed speaker wiring diagram
- Disconnected winch from truck batteries
- Purchased small filter for diesel air heater
- Drilled holes in fuel tank for heater and fuel heater fuel supply
- Used magnets inside tubing to remove any metal particles from inside tank (it worked really well)
- Trimmed fuel fitting standpipes to prevent heater from completely draining truck fuel tank
- Mounted fuel fittings in fuel tank
- Test ran electric air compressor
- Installed air heater fuel pump
- Finished air heater installation and purged air from fuel lines
- Test ran air heater
- Disposed of old engine coolant
- Topped off engine coolant
- Received gray water tank fittings
- Test fit jam nut on power steering box (12M-1.5)
- Extended wire length for speakers
- Installed filter and fuel pump for engine pre-heater
- Purchased switch for engine pre-heater
- Ordered additional air heater ducting and swivel vent
- Fabricated GPS odometer, compressor, and pre-heater switch bracket dash panel
- Painted switch bracket dash panel
- Bench assembled and installed switch bracket dash panel
- Removed unneeded / redundant passenger seat lap belt
- Tested out additional heater duct in kitchen (we will likely add more ducting)
- Cut witness groove in end of power steering adjustment stud (to maintain original reference position)
- Removed power steering adjustment jam nut and cleaned threads
- Installed new seal and jam nut on power steering box
- Adjusted steering slop out of power steering box
- Test drove truck to check steering play
- Washed truck
Removed old fuel primer pump
Removed old fuel primer pump
Installed new fuel primer pump
Replaced both fuel filters
Replaced both fuel filters
Replaced both fuel filters
Replaced both fuel filters
Replaced both fuel filters
Inspected air filter (nice and clean)
Trimmed interfering material away from gray water tank hold down
Prepped and primed gray water tank hold down
Painted gray water tank hold down
Pre-heater wiring
Reviewed electric air compressor wiring
Drilled holes in fuel tank for heater and fuel heater fuel supply
Drilled holes in fuel tank for heater and fuel heater fuel supply
Used magnets inside tubing to remove any metal particles from inside tank
Trimmed fuel fitting standpipes to prevent heater from completely draining truck fuel tank
Mounted fuel fittings in fuel tank
Mounted fuel fittings in fuel tank
Mounted fuel fittings in fuel tank
Test ran electric air compressor
Installed air heater fuel pump
Installed air heater fuel pump
Received gray water tank fittings
Fabricated GPS odometer, compressor, and pre-heater switch bracket dash panel
Fabricated GPS odometer, compressor, and pre-heater switch bracket dash panel
Fabricated GPS odometer, compressor, and pre-heater switch bracket dash panel
Fabricated GPS odometer, compressor, and pre-heater switch bracket dash panel
Fabricated GPS odometer, compressor, and pre-heater switch bracket dash panel
Bench assembled and installed switch bracket dash panel
Bench assembled and installed switch bracket dash panel
Removed power steering adjustment jam nut and cleaned threads
Removed power steering adjustment jam nut and cleaned threads
Removed power steering adjustment jam nut and cleaned threads
Removed power steering adjustment jam nut and cleaned threads
Removed power steering adjustment jam nut and cleaned threads
Removed power steering adjustment jam nut and cleaned threads
Installed new seal and jam nut on power steering box
Test drove truck to check steering play
- Received additional tool roll
- Continued to organize tool rolls
- Drained coolant
- Removed old engine pre-heater (120V AC electric)
- Relocated horn to accommodate new pre-heater
- Shortened air compressor intake line (was rubbing on grill)
- Lubricated and measured steering box adjustment stud size
- Removed engine water pump outlet hose
- Started looking for small power steering hose leak
- Removed pre-heater outlet hose
- Purchased and trimmed new radiator hoses
- Purchased new steering adjustment jam nut
- Purchased Zerex G05 50/50 coolant
- Fabricated pre-heater mount brackets
- Machined aluminum hose union
- Removed brackets in engine bay that interfered with pre-heater
- Installed new pre-heater brackets
- Seam sealed and painted pre-heater mount assembly
- Replaced lower radiator hose
- Rerouted pre-heater inlet hose
- Received fuel filters
- Mounted pre-heater and finalized pre-heater plumbing
- Refiled engine with Zerex G05 coolant
- Secured pre-heater wiring
- Started engine and burped coolant system
- Test drove and evaluated fluids:
- Nice firm brakes
- Good engine temperature
- Significant improvement in shifting with new fluid
Drained coolant
Removed old engine pre-heater (120V AC electric)
Removed brackets in engine bay that interfered with pre-heater
Removed brackets in engine bay that interfered with pre-heater
Fabricated pre-heater mount brackets
Fabricated pre-heater mount brackets
Fabricated pre-heater mount brackets
Installed new pre-heater brackets
Installed new pre-heater brackets
Installed new pre-heater brackets
Installed new pre-heater brackets
Lubricated and measured steering box adjustment stud size
Received fuel filters
Machined aluminum hose union
Machined aluminum hose union
Machined aluminum hose union
Removed engine water pump outlet hose and removed pre-heater outlet hose
Purchased and trimmed new radiator hoses
Replaced lower radiator hose
Mounted pre-heater and finalized pre-heater plumbing
Purchased Zerex G05 50/50 coolant
Refiled engine with Zerex G05 coolant
Started engine and burped coolant system
Test drove and evaluated fluids
- Machined sink drain adapter
- Installed sink drain and connected to drain hose
- Tested sink drain and checked for leaks
- Installed anti-rattle straps on under subframe storage boxes
- Took measurements for driver side accessory palette
- Started looking at design changes to our driver side accessory palette
- Started sequencing and planning final phase of truck build
- Moved truck back to shop
- Drained engine oil, transmission fluid, and differential oil
- Ordered fuel filters
- Verified correct oil filters on hand
- Verified correct replacement fluids and quantities
- Reviewed brake bleeding procedure for power bleeder
- Purchased engine oil
- Ordered DOT4 brake fluid
- Filled differentials with Redline 75W-90 (GL-5)
- Drained transfer case
- Drained engine oil filter
- Replaced oil filter and filled engine with oil (Rotella 15W-40)
- Torqued lug nuts
- Removed and replaces clutch drain
- Reduced tire pressure to 55psi
- Fit checked auxiliary diesel tank
- Identified small power steering hose leak
- Disposed of unneeded oil
- Test rain engine to check for leaks and oil level
- Filled transmission with Redline MT-85 (GL-4)
- Checked hubs, differentials, and clutch plug for oil leaks
- Inspected steering linkages
- Reviewed brake bleeding procedure in Mercedes manual
- Inspected rubber drive shaft boots
- Evaluated options for adjusting steering box
- Disposed of additional oil
- Picked up brake fluid
- Bled brakes
Machined sink drain adapter
Machined sink drain adapter
Machined sink drain adapter
Machined sink drain adapter
Machined sink drain adapter
Machined sink drain adapter
Machined sink drain adapter
Installed sink drain and connected to drain hose
Installed sink drain and connected to drain hose
Installed sink drain and connected to drain hose
Tested sink drain and checked for leaks
Installed anti-rattle straps on under subframe storage boxes
Installed anti-rattle straps on under subframe storage boxes
Moved truck back to shop
Moved truck back to shop
Drained engine oil, transmission fluid, and differential oil
Filled transmission with Redline MT-85 (GL-4)
Drained engine oil, transmission fluid, and differential oil
Filled differentials with Redline 75W-90 (GL-5)
Filled differentials with Redline 75W-90 (GL-5)
Bled brakes
Bled brakes
Bled brakes
Torqued lug nuts
Reduced tire pressure to 55psi
Replaced oil filter and filled engine with oil (Rotella 15W-40)
Replaced oil filter and filled engine with oil (Rotella 15W-40)
Test rain engine to check for leaks and oil level
- Measured for shield plates over rear wheels
- Fabricated stainless steel rear wheel shield plates
- Received tool roll
- Started organizing tools
- Purchased material for dinette foot rest
- Inventoried and back filled missing tools
- Fabricated dinette foot rest
- Prepped, masked, and bond installed dinette foot rest
- Purchased flex lines for under sink fresh water pump assembly
- Made plywood mounting palette for under sink fresh water pump assembly
- Tested cold weather performance of habitat using small space heater
- Habitat was rained on heavily: no leaks
- Sewed ratchet straps for under subframe box anti-rattle
- Fit checked under sink pump assembly
- Painted plywood mounting palette for under sink pump assembly
- Bench assembled water pump system
- Fit checked all under sink systems and located under sink pump assembly
- Drilled pilot hole for under sink drain
- Drilled 1″ hole for under sink drain and installed drain hose
- Drilled hole and installed tube for fresh water vent
- Bonded on stainless steel over tire rock shields
- Installed fresh water tank corral
- Installed water pump system
- Installed water filter
- Connected fresh water quick disconnect
- Connected faucet to water filter
- Wired and tested water pump
Fabricated stainless steel rear wheel shield plates
Fabricated stainless steel rear wheel shield plates
Bonded on stainless steel over tire rock shields
Fabricated dinette foot rest
Fabricated dinette foot rest
Fabricated dinette foot rest
Prepped, masked, and bond installed dinette foot rest
Prepped, masked, and bond installed dinette foot rest
Prepped, masked, and bond installed dinette foot rest
Drilled pilot hole for under sink drain
Drilled pilot hole for under sink drain
Drilled 1 inch hole for under sink drain and installed drain hose
Drilled hole and installed tube for fresh water vent
Sewed ratchet straps for under subframe box anti-rattle
Tested cold weather performance of habitat using small space heater
Tested cold weather performance of habitat using small space heater
Tested cold weather performance of habitat using small space heater
Tested cold weather performance of habitat using small space heater
Made plywood mounting palette for under sink fresh water pump assembly
Fit checked under sink pump assembly
Painted plywood mounting palette for under sink pump assembly
Wired and plumbed final water pump assembly
Wired and plumbed final water pump assembly
Wired and plumbed final water pump assembly
- Fit checked and installed left and right bed decks
- Wired and tested bed deck ventilation fans
- Installed overhead storage bins
- Installed stove alcohol cans
- Installed Froli star bed springs
- Installed mattress
- Checked ergonomics of bed height
- Test fit custom quilt
- Looked at priorities for next phase of truck work
- Measured and cut plywood for seat backs
- Bonded and trimmed 1″ foam on seat back panels
- Cut and painted support for aft dinette seat back
- Measured water pump mount area
- Measured, fabricated, and painted wire chase cover for over head board
- Fabricated stand offs for water pump mount
- Installed water pump mount standoffs under sink
- Installed support for aft dinette seat back
- Upholstered dinette seat backs
- Installed dinette seat backs
- Installed wire chase cover
Fit checked and installed left and right bed decks
Fit checked and installed left and right bed decks
Fit checked and installed left and right bed decks
Wired and tested bed deck ventilation fans
Installed overhead storage bins
Installed stove alcohol cans
Fabricated stand offs for water pump mount
Installed water pump mount standoffs under sink
Installed Froli star bed springs
Installed Froli star bed springs
Installed Froli star bed springs
Installed mattress
Installed mattress
Checked ergonomics of bed height
Checked ergonomics of bed height
Test fit custom quilt
Measured, fabricated, and painted wire chase cover for over head board
Measured, fabricated, and painted wire chase cover for over head board
Measured, fabricated, and painted wire chase cover for over head board
Installed wire chase cover
Installed wire chase cover
Cut and painted support for aft dinette seat back
Installed dinette seat backs
Measured and cut plywood for seat backs
Measured and cut plywood for seat backs
Bonded and trimmed 1-inch foam on seat back panels
Upholstered dinette seat backs
Upholstered dinette seat backs
Upholstered dinette seat backs
Installed dinette seat backs
Installed dinette seat backs
Installed dinette seat backs
Installed support for aft dinette seat back
Installed dinette seat backs
Cold outside and cozy inside
Cold outside and cozy inside
Cold outside and cozy inside
Cold outside and cozy inside
- Prewired GFCI breakers on bench
- Made mounting brackets for inverters
- Drilled mounting holes in under bed storage bins
- Finished all heater duct work
- Installed inverters
- Installed GFCI breakers
- Tested all 120V AC systems
- Cleaned underbed area
- Test fit driver side bed deck
- Picked location for overhead storage bins on bottom of bed deck
- Installed underbed storage bins
- Carpeted exposed surfaces in underbed cargo area
- Secured refrigerator power plug
- Mounted overhead storage bins to underside of drive side bed deck
- Installed electrical distribution panel polycarbonate shield
- Fabricated cargo net top mounting angle
- Installed cargo net mounting angle
- Installed cargo net
- Purchased supplies from hardware store
Prewired GFCI breakers on bench
Made mounting brackets for inverters
Made mounting brackets for inverters
Installed inverters and GFCI breakers
Finished all heater duct work
Finished all heater duct work
Finished all heater duct work
Cleaned underbed area
Drilled mounting holes in under bed storage bins
Drilled mounting holes in under bed storage bins
Installed underbed storage bins
Carpeted exposed surfaces in underbed cargo area
Carpeted exposed surfaces in underbed cargo area
Carpeted exposed surfaces in underbed cargo area
Fabricated cargo net top mounting angle
Installed cargo net mounting angle
Installed cargo net mounting angle
Installed cargo net
Test fit driver side bed deck
Picked location for overhead storage bins on bottom of bed deck
Picked location for overhead storage bins on bottom of bed deck
Mounted overhead storage bins to underside of drive side bed deck
Mounted overhead storage bins to underside of drive side bed deck
Installed electrical distribution panel polycarbonate shield
Under bed area finished and ready for bed deck
It’s nice to have the truck out in the open for a while
Satisfying to see interior progress
- Tested solar charging system under load
- Drilled bolt access holes in driver side under subframe storage box heat shield
- Made heater duct distribution box
- Cleaned under subframe storage boxes
- Remounted rear license plate
- Ran heater fuel line and heater pump wiring forward to fuel tank area
- Drilled and painted vent holes in water tank area
- Touched up paint in habitat
- Painted heater duct box
- Sealed vent holes in under subframe storage boxes with aluminum plates
- Silicone sealed under subframe storage boxes
- Added weather stripping to lids of under subframe storage boxes
- Installed under subframe storage boxes
- Bonded and screwed heater duct flanges to heater distribution box
- Bonded heater distribution box into habitat
- Measured driver side bed deck vent hole positions
- Measured inverter area
- Started laying out inverter and GFCI breakers
- Wired and installed composting toilet vent fan
- Installed composting toilet
- Made new bug screen for toilet intake (oops, I broke the first one)
- Drilled additional vent holes in driver side bed deck
Drilled bolt access holes in driver side under subframe storage box heat shield
Cleaned under subframe storage boxes
Sealed vent holes in under subframe storage boxes with aluminum plates
Sealed vent holes in under subframe storage boxes with aluminum plates
Added weather stripping to lids of under subframe storage boxes
Installed under subframe storage boxes
Installed under subframe storage boxes
Installed under subframe storage boxes
Made heater duct distribution box
Made heater duct distribution box
Made heater duct distribution box
Painted heater duct box
Bonded and screwed heater duct flanges to heater distribution box
Bonded heater distribution box into habitat
Drilled additional vent holes in driver side bed deck
Drilled additional vent holes in driver side bed deck
Drilled and painted vent holes in water tank area
Installed composting toilet
Installed composting toilet
Installed composting toilet
Installed composting toilet
Installed composting toilet
Made new bug screen for toilet intake
- Installed white rubber seal strip around entry door
- Modified entry door screen clips
- Fabricated insect seal between screen and wall
- Installed screen mounting clips with VHB
- Installed screen door
- Fabricated additional battery cables
- Installed battery cutoff switches
- Installed batteries
- Final wired solar charge controller
- Final wired battery assembly
- Set battery monitor for lithium batteries
- Tested overall battery system using battery power
- Cleaned and organized shop space
- Organized truck materials
- Installed velcro on bed deck contact surfaces
- Drilled heater mounting holes
- Dry fit composting toilet
- Bench assembled heater
- Installed heater in habitat
- Fabricated heat shield for heater on underside of habitat
- Bonded and screwed in heat shield
- Installed heater insulation
- Installed both under subframe storage box mounts and boxes
- Started preliminary layout of heater ducting
- Wired heater
- Started running heater ducting
Installed white rubber seal strip around entry door
Modified entry door screen clips
Modified entry door screen clips
Fabricated insect seal between screen and wall
Installed screen door
Fabricated additional battery cables
Fabricated additional battery cables
Installed batteries and battery cutoff switches
Installed batteries and battery cutoff switches
Drilled heater mounting holes
Drilled heater mounting holes
Bench assembled heater
Installed heater in habitat
Installed heater in habitat
Fabricated and installed heat shield for heater on underside of habitat
Fabricated and installed heat shield for heater on underside of habitat
Fabricated and installed heat shield for heater on underside of habitat
Fabricated and installed heat shield for heater on underside of habitat
Installed both under subframe storage box mounts and boxes
Installed both under subframe storage box mounts and boxes
Installed both under subframe storage box mounts and boxes
Installed both under subframe storage box mounts and boxes
Installed velcro on bed deck contact surfaces
Installed velcro on bed deck contact surfaces
Wired heater
Started running heater ducting
Started running heater ducting
Table cushions and flooring
Tested overall battery system using battery power
- Designed under subframe storage box lock plates
- Fabricated under subframe storage box lock plates
- Welded lock plates to under subframe storage box mounts
- Welded anti-rattle ratchet strap tabs to under subframe storage box mounts
- Welded steel heater exhaust heat shield to driver side under subframe storage box mount
- Primed under subframe storage box mounts
- Removed protective film from windows on entry door
- Cut, fit, and installed shower curtain track over shower
- Drilled holes in entry ladder mount for padlock
- Prepared under sink area for fresh water tank installation
- Fit checked water jerry can under sink (fits great!)
- Seam sealed and painted under subframe storage box mounts
- Started installation of marmoleum flooring
- Received overhead storage bins (for under bed)
- Removed right side driver’s arm rest
- Finished installing marmoleum flooring
- Fit checked screen door
- Purchased screen door installation hardware and other hardware store supplies
- Router kerfed underside of dinette table
- Mounted table leg socket to underside of table
- Cut table leg to length
- Fit checked dinette table
- Mounted table leg socket to floor of habitat
- Bonded in dinette table
Designed under subframe storage box lock plates
Fabricated under subframe storage box lock plates
Fabricated under subframe storage box lock plates
Fabricated under subframe storage box lock plates
Fabricated under subframe storage box lock plates
Fabricated under subframe storage box lock plates
Fabricated under subframe storage box lock plates
Welded lock plates to under subframe storage box mounts
Welded lock plates to under subframe storage box mounts
Welded lock plates to under subframe storage box mounts
Welded anti-rattle ratchet strap tabs to under subframe storage box mounts
Welded steel heater exhaust heat shield to driver side under subframe storage box mount
Welded steel heater exhaust heat shield to driver side under subframe storage box mount
Welded steel heater exhaust heat shield to driver side under subframe storage box mount
Primed under subframe storage box mounts
Seam sealed and painted under subframe storage box mounts
Received overhead storage bins (for under bed)
Received overhead storage bins (for under bed)
Prepared under sink area for fresh water tank installation
Cut, fit, and installed shower curtain track over shower
Cut, fit, and installed shower curtain track over shower
Cut, fit, and installed shower curtain track over shower
Cut, fit, and installed shower curtain track over shower
Cut, fit, and installed shower curtain track over shower
Cut, fit, and installed shower curtain track over shower
Cut, fit, and installed shower curtain track over shower
Drilled holes in entry ladder mount for padlock
Started installation of marmoleum flooring
Started installation of marmoleum flooring
Started installation of marmoleum flooring
Started installation of marmoleum flooring
Started installation of marmoleum flooring
Started installation of marmoleum flooring
Started installation of marmoleum flooring
Finished installing marmoleum flooring
Finished installing marmoleum flooring
Router kerfed underside of dinette table
Cut table leg to length
Mounted table leg socket to underside of table
Fit checked dinette table
Mounted table leg socket to floor of habitat
Mounted table leg socket to floor of habitat
Mounted table leg socket to floor of habitat
Bonded in dinette table
Bonded in dinette table
- Test fit dinette seat cushions
- Drilled vent holes in driver side bed deck
- Bonded storage mounting plywood to driver side bed deck
- Received padlocks
- Started fabrication of battery cutoff switch mount
- Measured bed deck support ledge
- Measured for shower mat
- Finished fabricating switch mount
- Ran wiring for engine pre-heater
- Fit checked OLFA mat
- Added second padlock to sand ladder
- Double sealed all joints in shower area
- Drilled fan ventilation holes in bed deck
- Painted bed deck
- Received ARB air compressor
- Waxed shower wall
- Fit checked shower mat
- Bonded in battery cutoff switch mount
- Measured for heater duct manifold
- Sewed battery hold down straps
- Received shower curtain track
- Installed and wired under bed ventilation fans
- Test drove and temporarily moved truck
Received padlocks
Received ARB air compressor
Received shower curtain track
Test fit dinette seat cushions
Test fit dinette seat cushions
Test fit dinette seat cushions
Drilled vent holes in driver side bed deck
Drilled vent holes in driver side bed deck
Drilled fan ventilation holes in bed deck
Painted bed deck
Installed and wired under bed ventilation fans
Cut shower mat
Cut shower mat
Cut shower mat
Fit checked shower mat
Started fabrication of battery cutoff switch mount
Bonded in battery cutoff switch mount
Fit checked OLFA mat
Sewed battery hold down straps
Test drove and temporarily moved truck
Test drove and temporarily moved truck