Truck Update 3/3/19

  • Measured for shield plates over rear wheels
  • Fabricated stainless steel rear wheel shield plates
  • Received tool roll
  • Started organizing tools
  • Purchased material for dinette foot rest
  • Inventoried and back filled missing tools
  • Fabricated dinette foot rest
  • Prepped, masked, and bond installed dinette foot rest
  • Purchased flex lines for under sink fresh water pump assembly
  • Made plywood mounting palette for under sink fresh water pump assembly
  • Tested cold weather performance of habitat using small space heater
  • Habitat was rained on heavily: no leaks
  • Sewed ratchet straps for under subframe box anti-rattle
  • Fit checked under sink pump assembly
  • Painted plywood mounting palette for under sink pump assembly
  • Bench assembled water pump system
  • Fit checked all under sink systems and located under sink pump assembly
  • Drilled pilot hole for under sink drain
  • Drilled 1″ hole for under sink drain and installed drain hose
  • Drilled hole and installed tube for fresh water vent
  • Bonded on stainless steel over tire rock shields
  • Installed fresh water tank corral
  • Installed water pump system
  • Installed water filter
  • Connected fresh water quick disconnect
  • Connected faucet to water filter
  • Wired and tested water pump