Truck Update 1/30/19

  • Test fit dinette seat cushions
  • Drilled vent holes in driver side bed deck
  • Bonded storage mounting plywood to driver side bed deck
  • Received padlocks
  • Started fabrication of battery cutoff switch mount
  • Measured bed deck support ledge
  • Measured for shower mat
  • Finished fabricating switch mount
  • Ran wiring for engine pre-heater
  • Fit checked OLFA mat
  • Added second padlock to sand ladder
  • Double sealed all joints in shower area
  • Drilled fan ventilation holes in bed deck
  • Painted bed deck
  • Received ARB air compressor
  • Waxed shower wall
  • Fit checked shower mat
  • Bonded in battery cutoff switch mount
  • Measured for heater duct manifold
  • Sewed battery hold down straps
  • Received shower curtain track
  • Installed and wired under bed ventilation fans
  • Test drove and temporarily moved truck