- Tested solar charging system under load
- Drilled bolt access holes in driver side under subframe storage box heat shield
- Made heater duct distribution box
- Cleaned under subframe storage boxes
- Remounted rear license plate
- Ran heater fuel line and heater pump wiring forward to fuel tank area
- Drilled and painted vent holes in water tank area
- Touched up paint in habitat
- Painted heater duct box
- Sealed vent holes in under subframe storage boxes with aluminum plates
- Silicone sealed under subframe storage boxes
- Added weather stripping to lids of under subframe storage boxes
- Installed under subframe storage boxes
- Bonded and screwed heater duct flanges to heater distribution box
- Bonded heater distribution box into habitat
- Measured driver side bed deck vent hole positions
- Measured inverter area
- Started laying out inverter and GFCI breakers
- Wired and installed composting toilet vent fan
- Installed composting toilet
- Made new bug screen for toilet intake (oops, I broke the first one)
- Drilled additional vent holes in driver side bed deck