Truck Update 2/10/19

  • Tested solar charging system under load
  • Drilled bolt access holes in driver side under subframe storage box heat shield
  • Made heater duct distribution box
  • Cleaned under subframe storage boxes
  • Remounted rear license plate
  • Ran heater fuel line and heater pump wiring forward to fuel tank area
  • Drilled and painted vent holes in water tank area
  • Touched up paint in habitat
  • Painted heater duct box
  • Sealed vent holes in under subframe storage boxes with aluminum plates
  • Silicone sealed under subframe storage boxes
  • Added weather stripping to lids of under subframe storage boxes
  • Installed under subframe storage boxes
  • Bonded and screwed heater duct flanges to heater distribution box
  • Bonded heater distribution box into habitat
  • Measured driver side bed deck vent hole positions
  • Measured inverter area
  • Started laying out inverter and GFCI breakers
  • Wired and installed composting toilet vent fan
  • Installed composting toilet
  • Made new bug screen for toilet intake (oops, I broke the first one)
  • Drilled additional vent holes in driver side bed deck