Truck Update 1/27/19

  • Designed and machined shower drains
  • Purchased material for shower tray edge
  • Purchased tubing for water tank pick up tubes
  • Ordered tool rolls
  • Ordered ARB air compressor
  • Received auxiliary diesel tank
  • Received heater exhaust duct insulation sleeve
  • Received 60mm heater duct flanges
  • Checked padlock clearances on truck storage boxes
  • Ordered keyed padlocks
  • Received battery cutoff switches
  • Received 2 of 4 tool rolls
  • Cut aluminum for shower tray edge
  • Machined brass fitting and sauder assembled shower valve
  • Bonded battons to underside of bed deck
  • Ordered overhead mount under bed storage
  • Started painting bed decks
  • Fit checked battery cut off switches
  • Fit checked and masked shower tray edge
  • Laid out shower drain locations
  • Tested step ladder
  • Installed shower valve and shower hose quick disconnect
  • Drilled shower drain holes in floor
  • Marked heat shield location on under subframe storage
  • Removed under subframe storage frames for modification
  • Bonded in shower drains
  • Bonded in shower tray edge