- Purchased large hole saw and engine pre-heater wire
- Fabricated long pilot shaft for large hole saw
- Hole saw cut heater exhaust opening in habitat floor
- Machined aluminum sleeve to finish heater passthrough hole
- Bonded aluminum sleeve into heater passthrough hole
- Replaced air dryer cartridge
- Spliced engine pre-heater wire
- Bonded oak trim to lower edge of bed opening
- Measured width of shower tray edge
- Received water tank quick disconnect fittings
- Laid out bed deck on plywood
- Researched water tank barb bulkhead fitting options
- Cut bed deck
- Started detail design of shower drains
- Finalized design of water tank pick up and vent
- Machined AN-4 bulkhead fitting into tank barb fittings
- Finalized layout of bed deck ventilation
- Worked on under subframe box locking ideas
- Ordered ceiling track for shower curtain
- Ordered battery cutoff switches