- Purchased hardware to finish seat bases
- Ordered material for heater exhaust passthrough
- Finalized layout of heater installation
- Finalized layout of charge controller installation
- Upholstered and assembled seat bases
- Received material for heater exhaust passthrough
- Installed aluminum support under outboard water jerry can
- Installed charge controller and Victron batter monitor shunt
- Test fit aft under subframe storage
- Final positioned heater and through drilled alignment hole
- Applied second coat of paint to aft dinette bench
- Changed out under bed LED strip lights (adhesive was failing)
- Color labeled high current wires
- Test fit heater exhaust hose
- Installed smoke / CO detector
- Installed digital inside / outside thermometers
- Test fit Omnia oven in kitchen drawer
- Sealed wire passthrough holes
- Started running power for engine pre-heater
- Measured bed deck dimensions
- Spliced wire extension for water pump under sink
- Ordered 60mm flanges from Heatso