- Received marmoleum
- Machined mounting plate for ground power plug
- Enlarged mounting holes for pit pin tethers
- Made heat shield for alcohol stove
- Completed fabrication of calorifier cabinet assembly
- Drilled holes in shower area divider for shower fixture
- Drilled plumbing passthrough holes in calorifier cabinet assembly
- Filled and sanded fastener holes in calorifier cabinet assembly
- Prepped and applied first coat of paint to calorifier cabinet assembly
- Installed
- Latches on kitchen upper cabinets
- Heat shield for stove
- Stove
- Slide out/cutting board
- Kitchen drawers
- Lower kitchen cabinet doors
- Sink
- Kitchen filtered water faucet
- Entry ladder pit pins
- Fit checked Sirocco II fan in bed area
- Drilled hole and bonded mounting for ground power plug
- Sealed edge of FRP panel with epoxy and micro balloons
- Masked and urethaned red oak edge trim on shower area divider
- Started designing and cutting stock for shower valve mounts
- Started designing and fabricating interior ground power plug mount
- Finished machining interior cap for ground power plug mount
- Finished machining shower valve mount
- Rounded corners of interior grab handle
- Ordered gel goat wax and water disconnect fittings
- Test fit, masked, prepped, bonded, and screwed shower area divider and passenger side table