Truck Update 12/23/18

  • Cleaned and organized shop
  • Tapped clamping hole in shower valve mount
  • Ordered additional electrical materials
  • Planned staged electrical system installation
  • Fabricated ground mounting plug hardware
  • Installed
    • LED entry light
    • Interior grab handle
    • Passenger side LED under cabinet lights
    • Kitchen LED under cabinet lights
    • Ground power plug
    • Shower valve mount
  • Touched up paint
  • Drilled wire runs in cabinets for LED lights
  • Ordered additional electrical components… again…
  • Started design of power bus bar mounting
  • Cut wire for main wire harness
  • Terminated wires for switch breaker panel
  • Received
    • Switch breaker panel
    • Electrical components
    • Quick disconnects
  • Purchased shower plumbing components
  • Labeled all wire harness wires
  • Made breaker to switch jumpers
  • Reviewed battery monitor wiring
  • Test fit switch panel
  • Fabricated hot bus bar for switch panel
  • Started assembly of switch panel
  • Started consideration of modification of eating table
  • Finished switch panel assembly