- Ordered
- Marmoleum flooring
- Ordered and received
- Hot water expansion tank
- Small grab handle
- Fire extinguishers
- CO/Smoke detector
- Indoor/outdoor thermal weather station
- Started designing calorifier cabinet and refrigerator support
- Started designing shower area divider
- Applied first 2 coats of urethane to passenger side table
- Paint stripped and cleaned candidate donor entry ladder
- Reviewed geometry of entry ladder options
- Started fabrication of candidate entry ladder
- Fit checked candidate entry ladder
- Fabricated candidate entry ladder
- Final assembled candidate entry later
- Test fit candidate entry ladder
- Final coated urethane on passenger side table
- Purchased material for shower area divider
- Ordered
- Caframo Sirocco II gimbal fan
- Ground shore power electrical components
- Laid out shower area divider on 3/4″ plywood
- Rough cut shower area divider
- Test fit shower area divider with passenger side table
- Trimmed shower area divider
- Rough cut FRP panel for shower area divider
- Prepped and bonded FRP panel to shower area divider
- Designed and ordered switch panel from Front Panel Express