- Test fit kitchen pantry
- Masked, prepped, bonded, and screwed kitchen pantry
- Made RTV gaskets for awning mount
- Welded square nuts to stainless 6M all-thread for awning t-bolts
- Machined and welded phillips drive extension
- Sealed, bolted, and installed ARB awning
- Fit checked, masked, prepped, bonded, and screwed headboard/cubby assembly
- Routed square edges on oak plank for passenger side table
- Bonded oak together for passenger side table
- Received SurCal calorifier
- Started water system layout
- Started laying out alternate entry ladder
- Tested samples of bathroom floor material
- Started selecting plumbing components for hot water system
- Cut passenger side oak table to size
- Drilled wire passthrough hole in passenger side table top
- Cut clearance for refrigerator in passenger side table top
- Clearanced passenger side table top for wall structure
- Final sanded surface of passenger side oak table top
- Fit checked table in habitat
- Took detail measurements for alternate ladder
- Received and fit checked entry grab handle
- Fit checked, prepped, and bonded bathroom cabinets