- Drilled 2 1/2″ hole through floor for airhead composting toilet fan
- Drilled and ran wiring from lower driver side corner to airhead composting toilet fan
- Fixtured and clecoed lower 4 corner caps
- Torqued and sealed all 4 wired gland nut bulkhead fittings
- Milled outer round contour of spare tire mount plate
- Fit checked spare tire mount plate on spare tire wheel hub
- Milled side gussets for spare tire mount plate
- Cut vertical rails to mount spare tire
- Trimmed spare tire mounting lugs
- Bonded forward upper driver side corner cap
- Bonded 5 more corner caps
- Received 12/24V LED fog lights
- Received 12/24V size 194 LED marker light upgrade bulbs
- Received 3 additional Grote amber marker lights
- Bonded final 2 corner caps
- Received 4 of 6 100W solar panels
- Sand blasted plating off tire mount studs
- Final welded tire mount plate
- Received final 2 100W solar panels
- Weld prepped tire mount plate support straps
- Tack welded tire mount support strap assembly
- Welded tire mount assembly onto rear frame
- Drilled holes through rear frame for sand ladder mount studs
- Reviewed battery options
- Cut steel box beam for final tire mount structure
- Removed clecos from corner caps
- Countersunk cleco holes using aircraft microstop
- Filled cleco holes with Korapop 225
- Sealed all internal habitat joints using 225
- Sealed forward driver side vertical joint using 225
- Sealed habitat side passthrough frame joint with 225