  • Crimped and terminated heavy gauge wire for solar panels
  • Crimped and terminated wires in rear lower passenger corner
  • Started running driver side wiring
  • Started evaluating roof solar panel configurations
  • Selected solar panels
  • Finished running driver side wiring
  • Crimped and terminated wires in rear lower driver corner
  • Started securing wires in extrusion using acoustic foam
  • Ordered solar panels
  • Ordered 24V LED fog light replacements
  • Ordered gland nuts for habitat to exterior passthrough connections
  • Planned habitat wire penetration locations
  • Started planning air head toilet vent fan location and wiring
  • Finished securing wires in extrusion using acoustic foam
  • Received McMaster-Carr order
  • Started finalizing placement of air head composting toilet and vent
  • Spliced exterior wiring to go through gland nuts
  • Created cut template for interior over bed lighting
  • Test fit cabinet in several desired interior locations
  • Wired and installed over bed lighting
  • Purchased hole saws to finalize wiring for corner closeouts
  • Completed preliminary welding of spare tire mount plate
  • Painted tire hoist side strut
  • Milled mounting flat on upper sand ladder mount bolt
  • Dry installed all 4 external gland nuts
  • Fixtured and clecoed upper 4 corner caps