- Crimped and terminated heavy gauge wire for solar panels
- Crimped and terminated wires in rear lower passenger corner
- Started running driver side wiring
- Started evaluating roof solar panel configurations
- Selected solar panels
- Finished running driver side wiring
- Crimped and terminated wires in rear lower driver corner
- Started securing wires in extrusion using acoustic foam
- Ordered solar panels
- Ordered 24V LED fog light replacements
- Ordered gland nuts for habitat to exterior passthrough connections
- Planned habitat wire penetration locations
- Started planning air head toilet vent fan location and wiring
- Finished securing wires in extrusion using acoustic foam
- Received McMaster-Carr order
- Started finalizing placement of air head composting toilet and vent
- Spliced exterior wiring to go through gland nuts
- Created cut template for interior over bed lighting
- Test fit cabinet in several desired interior locations
- Wired and installed over bed lighting
- Purchased hole saws to finalize wiring for corner closeouts
- Completed preliminary welding of spare tire mount plate
- Painted tire hoist side strut
- Milled mounting flat on upper sand ladder mount bolt
- Dry installed all 4 external gland nuts
- Fixtured and clecoed upper 4 corner caps