- Organized and rearranged tools in shop
- Sealed holes used to bond hardpoints on rear wall
- Prepped around window openings for window install
- Tested wire splicing technique
- Receive McMaster-Carr order for tire mount hardware
- Machines sand ladder mount studs
- Taped out floor plan and cabinet positions
- Re-taped butcher paper to floor of habitat
- Verified interior dimensions
- Updated power use spreadsheet
- Started preliminary solar panel and battery selection
- Drilled mounting bolt clearance holes in tire mount frame
- Ordered tire mount bolts
- Installed over bed windows
- Installed over counter windows
- Drilled and tapped mounting holes in rear panel hardpoints for mounting frame
- Received McMaster-Carr order
- Fit checked cargo access hatches
- Tested 8 gauge wire crimper
- Installed, clipped, and bonded access hatches
- Installed weather stripping on access hatches
- Wired and installed Fan-tastic vent
- Measured roof area for solar panels
- Machined marker light brackets for rear mount frame
- Machined sand ladder hold down nut components
- Checked continuity and re-labeled wires
- Prepped, bonded, and clipped roof hatch
- Rearranged truck parts storage room
- Wired and finish installed roof hatch