Truck Update 6/17/18

  • Organized and rearranged tools in shop
  • Sealed holes used to bond hardpoints on rear wall
  • Prepped around window openings for window install
  • Tested wire splicing technique
  • Receive McMaster-Carr order for tire mount hardware
  • Machines sand ladder mount studs
  • Taped out floor plan and cabinet positions
  • Re-taped butcher paper to floor of habitat
  • Verified interior dimensions
  • Updated power use spreadsheet
  • Started preliminary solar panel and battery selection
  • Drilled mounting bolt clearance holes in tire mount frame
  • Ordered tire mount bolts
  • Installed over bed windows
  • Installed over counter windows
  • Drilled and tapped mounting holes in rear panel hardpoints for mounting frame
  • Received McMaster-Carr order
  • Fit checked cargo access hatches
  • Tested 8 gauge wire crimper
  • Installed, clipped, and bonded access hatches
  • Installed weather stripping on access hatches
  • Wired and installed Fan-tastic vent
  • Measured roof area for solar panels
  • Machined marker light brackets for rear mount frame
  • Machined sand ladder hold down nut components
  • Checked continuity and re-labeled wires
  • Prepped, bonded, and clipped roof hatch
  • Rearranged truck parts storage room
  • Wired and finish installed roof hatch