- Chamfered edges of rear wall panel
- Prepped and bonded steel hardpoints in rear wall panel
- Tack welded tire mount ladder brackets
- Fabricated and test fit tire boom hoist side strut
- Fit checked rear extrusions
- Trimmed 1/8″ from upper and lower rear extrustions
- Positioned tire mount on rear panel
- Clearance checked tire mount with extrusions
- Match drilled pilot holes for tire mount on rear panel
- Cut and labeled wiring for installation of rear panel
- Installed and wire wrapped rear panel wiring
- Prepped and bonded lower extrusion to rear panel
- Drilled wiring hole for fantastic fan
- Repositioned rear panel on shop floor
- Marked location of solar panel wire passthrough on roof
- Planned rear wall bond sequence
- Drilled wiring holes for interior spotlights
- Drilled wiring hole in roof panel for solar wiring
- Ran wiring on back edge of roof panel
- Bonded driver side vertical extrusion on rear panel
- Prepped and final bonded rear panel (last panel bond!)
- Removed clamps from rear panel