- Removed blank plug from dash for reverse camera shutoff switch
- Modified blanking plate for reverse camera shutoff switch
- Started body working forward passenger fender
- Installed rear camera display switch
- Test fit passthrough accordion seal
- Measured cab interior light switch position
- Fabricated cab interior light switch bracket
- Installed cab interior light switch bracket and switch
- Received sound deadening floor mats from Atkinson Vos
- Finished cab light installation
- Rounded sharp corners of passthrough frame
- Tested cab audio system with USB MP3 files
- Final mounted marker light relay under dash
- Capped off unneeded audio wires in cab
- Stowed 24V marker light wires in cab
- Finished body working forward passenger fender
- Prepped, primed, and painted forward passenger fender
- Rewired ground wiring for winch
- Secured all winch wiring
- Rewired cab stereo and speakers
Truck Update 10/2/2018
Thanks for all the help this week, Dale!
- Trimmed sand ladder spacers for better fit
- Injection pump correspondence
- Installed EGT gauge in exhaust manifold
- Inspected turbocharger
- Fabricated and painted EGT gauge mount bracket
- Disassembled dash to gain wiring access
- Ran power for EGT gauge from tachometer circuit breaker
- Final installed EGT gauge
- Ran power off of 12V converter for backup camera
- Installed backup camera and monitor on dash
- Replaced faulty power plug on backup camera monitor
- Started troubleshooting cab side marker light wiring
- Shortened reverse camera monitor mount height
- Finalized reverse camera installation
- Final wired all habitat marker lights
- Final wired fog lights
- Let the smoke out of several 24V rated LED bulbs in marker lights. Evidently they were not rated for 24V.
- Continued troubleshooting cab side marker light wiring
- Added a 24V triggered 12V supply relay to power all marker lights
- Capped and terminated unneeded military light wires
- Reassembled dash and organized all wiring harnesses
Truck Update 9/23/18
- Inquired about purchasing a subset of the U1300L sound deadening kit from Atkinson Vos
- Inspected winch power cables
- Inquired with several companies about fuel injection pump upgrade options
- Ordered and received small, temporary habitat ventilation fan for airing out habitat
- Purchased indoor/outdoor carpet for areas inside cab
- Tested alternate adhesive for melamine foam
- Started making lists of provisioning goods for trips
- Ordered and received JBL Charge 3 speaker for cab and habitat
- Ordered and received walkie talkies
- Purchased mosquito head netting
- Fabricated lower aft marker light brackets
- Fabricated backup camera mount
- Replaced fog lights with new LED lights
- Bonded on lower rear marker light
- Installed passenger side LED external strip light
- Picked location for:
- EGT gauge readout
- Backup camera monitor
- Final wired passenger side LED external strip light
- Started wiring lower aft marker lights
Truck Update 9/16/18
- Started habitat lift and scheduling
- Purchased furniture dollies for moving habitat in shop
- Coordinated with local crane company about habitat lift
- Jacked up habitat and laced it on caster dollies
- Moved habitat box to opposite side of shop
- Started preparing for habitat lift
- Lifted habitat onto subframe
- Aligned, bonded, and bolted habitat to subframe
- Installed
- Rock guards
- Rear fenders
- Sand ladders
- Passenger jerry can mount
- Rear pintal
- Shovel on roof rack
- Removed protective film from outside of habitat
- Installed spare tire on rear frame
Habitat Lift
Today was a big day for the project. We crane lifted our @totalcomposites habitat box onto our U1300L this evening. The habitat is temporarily sitting on wooden blocks, so it’s sitting about 4” higher than it will. We will be re-positioning and securing it to the torsion free subframe in the next few days.



Truck Update 9/9/18
- Installed roof hatch spoiler
- Adjusted door captures on habitat
- Made templates for melamine on back wall of cab
- Received grip tape and VHB
- Laid out and cut melamine acoustic insulation for cab using templates
- Applied grip tape to access ladders and steps
- Melamine acoustic insulation bond test
- Prepped and painted passenger side jerry can mount
- Bonded melamine foam to rear cab wall
- Truck cleaning session
- Temporarily reinstalled driver seat
- Reinstalled front grill
- Prepped and coated tail lights with spar urethane
Truck Update 9/2/18
- Ordered MC4 solar panel cable extensions
- Machined copper bus bar
- Purchased electrical boxes for solar wiring
- Fit checked cable junction box on habitat roof
- Milled back of electrical junction box flat
- Received MC4 solar panel wires
- Ordered MC4 15 amp solar panel fuses
- Ordered gland nuts, ring terminals, and other electrical hardware
- Started laying out large electrical junction box
- Cut aluminum for roof wire hold down plates
- Continued laying out large electrical junction box
- Received gland nuts and ring terminals
- Crimped and shrink wrapped 4 gauge ring terminal
- Made gland nut template for junction box
- Bored gland nut holes in junction box
- Received MC4 15 amp inline fuses
- Completed fabrication of junction box
- Milled slots in aluminum roof wire hold down plates
- Bonded junction box to roof
- Deburred and applied VHB to roof wire hold down plates
- Installed fuses and routed solar wires on roof
- Fabricated junction box lid hold down plate
- Final wired junction box
- Closed out junction box
- Final routed 4 gauge habitat power wires
Truck Update 8/26/18
- Installed shovel mounts on front of roof rack
- Installed bike enclosure aluminum plate on roof rack
- Installed silicone bumpers between bike enclosure and cargo box
- Looked for candidate locations for additional small fuel tank
- Cleaned cab roof
- Reinstalled roof hatch
- Reinstalled roof rack
- Met with Erik from Spin Imaging about vinyl graphics options
- Machined aluminum spacers to level roof rack
- Seam sealed roof rack joints
- Final installed roof rack with thread sealer
- Installed roof rack support struts
- Sealed and riveted open holes in roof rack box lid
- Installed roof rack boxes
- Measured and laid out roof rack access ladders
- Purchased steel for cab ladders
- Cut steel for cab ladders
- Sheared and rolled steel for upper ladder corners
- Rotary table milled plate for upper ladder corners
- Welded ladder corners into ring and cut into 4 pieces
- Welded ladders
- Fit checked ladders
- Fabricated lower mount for ladders
- Purchased paint for ladders
- Fabricated passenger side ladder mount shim
- Seam sealed ladder joints
- Made RTV gaskets for ladder mounts
- Made hardware kit for mounting ladders
- Match drilled ladder mount holes into truck and roof rack
- Installed door lock into habitat
- Cab cleanup
- Evaluated ergonomics of ladders while temporarily mounted to cab
- Increased step area of lower 2 ladder rungs
- Prepped, primed, and painted ladders
- Mounted ladders
Truck Update 8/19/18
- Welded shortened roof rack brackets
- Opened up roof rack mount holes from 5/16″ to 3/8″
- Drilled drain holes in roof rack rails
- Fabricated diagonal roof rack braces
- Fit checked roof rack mount brackets
- Test fit diagonal roof rack braces
- Laid out and cut expanded metal for side and back of bike enclosure cage
- Received marker lights
- Received auxiliary fuel tank locking filler neck
- Received candidate gray water tank
- Welded expanded metal to side and back of bike enclosure cage
- Prepped, primed, and painted roof rack support struts
- Prepped, primed, and painted roof rack mounting brakcets
- Made hardware kits for mounting the roof rack
- Final test fit folding bikes in roof rack
- Removed roof hatch from cab
- Looked at locations for candidate gray water tank
- Cleaned, prepped, and painted roof hatch
- Made hardware kit for mounting roof storage boxes
- Ordered rubber shovel mounts for roof rack
- Researched alternate heater fuel tanks
- Received Seagull IV X-1F drinking water purifier
- Received Planar 2D-12 diesel heater and accessories from Total Composites
- Fabricated aluminum large area washers for roof rack box mount
- Cut replacement fiber board insulation backing disc for roof hatch
- Cut melamine acoustic foam for roof hatch insulation
- Painted roof hatch backing board
- Machined and weld prepped bike tie down tangs
- Machined and weld prepped shovel attach plates
- Assembled refurbished roof hatch
- Added additional weather stripping seal around roof hatch edge
- Finished all welding on roof rack
- Ordered P clamps for bike enclosure
- Fabricated aluminum plate for bike enclosure
- Prepped, primed, and painted aluminum plate for bike enclosure
- Prepped, primed, and painted roof rack
Truck Update 8/12/18
- Ordered and received folding bikes
- Funny enough, after all the consideration, we placed an order for 2 Dahon Speed Uno folding bikes. We received one Dahon Speed Uno and one Dahon Speed P8.
- Re-positioned habitat support foam blocks in preparation for future box lift
- Preliminary planning for auxiliary fuel tank vent line
- Took measurements for roof rack access ladders
- Removed roof rack
- Ordered and received shower floor (Thanks MK and FR!)
- Purchased “prospector” tools
- Shovel
- Hatchet
- Pruning Saw
- Inspected roof hatch
- Preliminary planning for next 2 months
- Ordered Planar 2D-12 diesel heater and accessories from Total Composites
- Made hardware kit for entry ladder mount bracket
- Bolted entry ladder mount bracket to subframe
- Blew hangar dust off of habitat and truck
- Bonded raw wood test pieces with Korapop 225
- Ordered auxiliary fuel tank locking filler neck
- Ordered and received infrared pyrometer for portal axles
- Ordered and received NPT weld on bungs for auxiliary fuel tank
- Ordered candidate gray water tank
- Ordered 2 additional marker lights
- Ordered and received EGT gauge (SYL-1813-24) and K type thermocouple (TC-KEGT) from Auber Instruments
- Ordered and received aluminum to mount Räskog cabinets
- Researched water filtration options
- Sealed final exterior habitat joints using Korapop 225
- Ordered Seagull IV X-1F drinking water purifier
- Created preliminary roof rack layout
- Started fabricating new roof rack components
- Laid out storage box mounting locations on roof rack
- Removed roof rack brackets from U1300L cab roof
- Removed hatch translation arm from U1300L cab
- Rough cleaned U1300L cab roof
- Cut down height of roof rack brackets by 2 1/2″
- Removed unneeded steel from roof rack
- Removed paint from roof rack for weld prep
- Milled adjustment slots in roof rack brackets
- Enlarged bolt holes from 5/16″ to 3/8″ in roof rack brackets
- Fabricated roof rack support strut bracket
- Fabricated tie down loop bracket plates
- Fabricated ladder mount plates
- Cut steel for storage box support structure
- Purchased additional steel and paint for roof rack
- Cut steel for bike enclosure cage
- Fabricated, tacked, and TIG welded preliminary bike enclosure frame on roof rack
- Match drilled cargo boxes to roof rack