- Ordered and received folding bikes
- Funny enough, after all the consideration, we placed an order for 2 Dahon Speed Uno folding bikes. We received one Dahon Speed Uno and one Dahon Speed P8.
- Re-positioned habitat support foam blocks in preparation for future box lift
- Preliminary planning for auxiliary fuel tank vent line
- Took measurements for roof rack access ladders
- Removed roof rack
- Ordered and received shower floor (Thanks MK and FR!)
- Purchased “prospector” tools
- Shovel
- Hatchet
- Pruning Saw
- Inspected roof hatch
- Preliminary planning for next 2 months
- Ordered Planar 2D-12 diesel heater and accessories from Total Composites
- Made hardware kit for entry ladder mount bracket
- Bolted entry ladder mount bracket to subframe
- Blew hangar dust off of habitat and truck
- Bonded raw wood test pieces with Korapop 225
- Ordered auxiliary fuel tank locking filler neck
- Ordered and received infrared pyrometer for portal axles
- Ordered and received NPT weld on bungs for auxiliary fuel tank
- Ordered candidate gray water tank
- Ordered 2 additional marker lights
- Ordered and received EGT gauge (SYL-1813-24) and K type thermocouple (TC-KEGT) from Auber Instruments
- Ordered and received aluminum to mount Räskog cabinets
- Researched water filtration options
- Sealed final exterior habitat joints using Korapop 225
- Ordered Seagull IV X-1F drinking water purifier
- Created preliminary roof rack layout
- Started fabricating new roof rack components
- Laid out storage box mounting locations on roof rack
- Removed roof rack brackets from U1300L cab roof
- Removed hatch translation arm from U1300L cab
- Rough cleaned U1300L cab roof
- Cut down height of roof rack brackets by 2 1/2″
- Removed unneeded steel from roof rack
- Removed paint from roof rack for weld prep
- Milled adjustment slots in roof rack brackets
- Enlarged bolt holes from 5/16″ to 3/8″ in roof rack brackets
- Fabricated roof rack support strut bracket
- Fabricated tie down loop bracket plates
- Fabricated ladder mount plates
- Cut steel for storage box support structure
- Purchased additional steel and paint for roof rack
- Cut steel for bike enclosure cage
- Fabricated, tacked, and TIG welded preliminary bike enclosure frame on roof rack
- Match drilled cargo boxes to roof rack