- Continued Routing wires under bed
- Installed over kitchen LED lighting
- Installed all AC receptacles and ran AC wires to inverter area
- Ran wiring for small ventilating fans
- Finished all kitchen wiring
- Received small ventilation fans
- Received additional water jerry cans
- Purchased additional wiring (again…)
- Wired heavy gauge wire to distribution panel
- Installed ANL fuse
- Organized and secured wire runs
- Terminated wire run at distribution panel
- Fabricated over bed fan mount
- Installed over bed fan
- Started running wiring for engine pre-heater
- Finished all distribution panel wiring
- Wired and mounted temporary DC power supply
- Turned on power for the first time!
- Tested all circuits
- Wired and function checked refrigerator
- Function checked all fans, lights, etc.