- Mounted refrigerator slide on refrigerator
- Installed refrigerator and slide in habitat
- Test fit, masked, prepped, and bonded forward bench riser
- Final installed forward bench cabinet face
- Installed battery tray and footman’s loops
- Test fit, masked, prepped, and bonded under bed divider and storage partition
- Purchased tie down straps for batteries
- Started finalizing electrical system layout
- Started bulk habitat wire routing
- Received bungee cargo net and carabiners
- Received candidate water jerry can
- Machined end brackets for under bed partition diagonal brace
- Installed under bed partition diagonal brace
- Machined refrigerator and fill pump electrical socket mounts
- Installed refrigerator power socket
- Installed under bed storage LED lighting
- Installed water tank fill pump power socket
- Extended several wires that were installed 6 months ago
- Started running wire for each system
- Installed over table LED spotlight
- Wired over table LED strip light
- Wired entry LED light