Truck Update 11/11/18

  • Purchased the majority of the lumber and plywood for habitat interior
  • Cut wood and started assembling kitchen upper cabinets
  • Finished design and started fabricating bed walls
  • Bonded and screwed lower bed wall member to habitat floor
  • Assembled and bonded upper kitchen cabinet face
  • Ordered cabinet latches
  • Glued/screwed upper kitchen cabinet face
  • Finalized size of plywood for kitchen walls and upper kitchen cabinets
  • Corresponded with Battle Born about charge controllers
  • Requested information on portal axle oil reservoir options
  • Cut plywood for:
    • Kitchen walls
    • Upper kitchen cabinets
    • Bathroom wall
    • Kitchen pantry
  • Assembled upper kitchen cabinet
  • Modified lower kitchen cabinet support base
  • Started painting:
    • Base board
    • Back of lower kitchen cabinet
    • Mid lower bed wall
  • Purchased trim to finish edge of plywood
  • Ordered Victron charge controller and battery monitor from Battle Born
  • Cut and installed upper kitchen cabinet dividers
  • Bonded edge trim to bed walls
  • Filled screw holes and sanded upper kitchen cabinet
  • Sanded edges of bed walls
  • Cut wood for bed support
  • Assembled, glued, and screwed bed support rails
  • Painted upper cabinet
  • Painted lower kitchen cabinet support
  • Received water strainer and accumulator
  • Fit checked, prepped, bonded, and screwed bed support rails into habitat
Advertisements