- Organized electrical supplies
- Wired marker lights on rear frame
- Replaced 12V marker lights with 24V LED bulbs
- Tested marker lights
- Test fit rear frame
- Increased rear frame hole clearance
- Bonded and installed rear frame
- Installed ladder on rear frame
- Installed hoist side strut on rear frame
- Final wired rear marker lights
- Sealed forward and both side panel to extrusion joints with Korapop 225
- Sealed roof to extrusion joints with Korapop 225
- Researched folding bike options
- Started reviewing roof rack layout modifications
- Received BattleBorn batteries from Sunsense Solar
- Fabricated rain guard for habitat side passthrough
- Fabricated forward upper marker light rail
- Mounted and wired forward upper marker lights
- Replaced and operationally checked forward marker light bulbs with 24V LED
- Placed reflective tape around upper corners of rear panel
- Drilled and tapped rain guard mounting holes in habitat side passthrough frame
- Bonded and installed rain guard with Korapop 225
- Bonded forward upper marker light rail
- We held the rail in place with 3M double sided tape while the Korapop 225 cured
- Purchased reflectors for habitat