Habitat Update 3/2/18

It’s a big day for the new habitat: our custom habitat kit from Total Composites arrived today! More details coming soon as we get into inventorying everything, but here are a few photos from the day.

We had 2 hours to unload the container, but with the 2 of us and a friend it took less than an hour to unload. Most of the panels are quite light and can be carried by 2 people. The floor panel weighs a bit and required all of us (including the truck driver) to carry it.

The container had a tamper free lock from U.S. customs on it. The truck driver didn’t have a bolt cutter and seemed concerned when he showed up. It took just a second to cut the lock off with an abrasive disc on a grinder.

Sea Container Arrives
Sea Container Arrives
Panels After Removing Small Boxes
Panels After Removing Small Boxes
Panels After Inspection
Panels After Inspection
Floor Panel on Subframe
Floor Panel on Subframe