Habitat Update 3/2/18

It’s a big day for the new habitat: our custom habitat kit from Total Composites arrived today! More details coming soon as we get into inventorying everything, but here are a few photos from the day.

We had 2 hours to unload the container, but with the 2 of us and a friend it took less than an hour to unload. Most of the panels are quite light and can be carried by 2 people. The floor panel weighs a bit and required all of us (including the truck driver) to carry it.

The container had a tamper free lock from U.S. customs on it. The truck driver didn’t have a bolt cutter and seemed concerned when he showed up. It took just a second to cut the lock off with an abrasive disc on a grinder.

Sea Container Arrives
Sea Container Arrives
Panels After Removing Small Boxes
Panels After Removing Small Boxes
Panels After Inspection
Panels After Inspection
Floor Panel on Subframe
Floor Panel on Subframe
Advertisements