- Received shower plumbing fittings
- Received entry door grab handle mount hardware
- Received gray water tank hold down hardware
- Cleaned and sealed driver side under subframe storage boxes
- Riveted rubber Jerry can support bumpers
- Started looking at injection pump adjustment access
- Installed
- Driver side under subframe mount
- Under subframe storage boxes
- Driver side Jerry cans
- Gray water tank
- Plumbed kitchen sink to gray water tank
- Installed gray water tank vent tube
- Installed gray water tank vent valve
- Measured toilet vent fan splash guard area
- Started laying out shower drain plumbing
- Purchased additional plumbing parts for shower drain
- Final installed air heater exhaust muffler
- Secured air heater intake silencer
- Ordered steel for rear bumper assembly
- Recieved entry door grab handle
- Fabricated toilet vent fan splash guard
- Cut stainless steel screen for toilet vent fan splash guard
- Final installed toilet vent fan splash guard
- Started looking at habitat door hold open catch
- Installed shower drain plumbing assembly
- Connected shower drain to gray water tank
- Fabricated external entry door grab handle mount assembly
- Installed external entry door grab handle
- Started looking at ladder storage
- Started looking at passthrough door hold open catch
- Located passthorugh door bump stop
- Started designing forward internal entry door grab handle
- Bench assembled electric air compressor to truck manifold
- Received rear bumper material
- Received tire air gauges
- Finished fabricating forward internal grab handle components
- Fabricated passthrough door bump stop
- Fabricated bracket assembly for entry door hold open catch
- Installed forward internal grab handle
- Installed electric air compressor manifold onto truck
- Installed footman’s loop in passthrough for door open catch
- Bonded passthrough door bump stop
- Installed entry door hold open catch bracket and footman’s loop
- Cut steel for rear bumper tube
- Tack welded full length of bumper tube
- Final welded bumper tube joints
- Cut clamp up tubes for mud flap bolts
- Welded clamp up tubes into bumper
- Fit checked bumper tube on truck
- Primed and painted bumper tube
- Stenciled fuel tank and Jerry cans
- Reamed out mud flap bolt holes on bumper tube
- Prepped weld location for bumper mount
- Mounted bumper to truck
- Touched up paint on bumper assembly
- Cut rubber for mud flaps
- Cut aluminium for mud flaps
- Made bolt kit for mounting mud flaps
- Put reflective tape on bumper
- Installed mud guards and flaps