Truck Update: 3/11/18

  • Ordered and received tile
  • Ordered and received LED eyeball lights
  • Ordered and received under counter LED lights
  • Ordered kitchen cabinet and locks
  • Ordered 2 1/2″ receiver pintal
  • Purchased marine adhesive for floor hardpoint bonding
  • Created assembly sequence list
  • Started passthrough design work
  • Started electrical wiring plan
  • Inspected position of floor on subframe
  • Measured and inspected all panels and corner extrusions
  • Trimmed foam to fit in hardpoint channel
  • Dry fit forward lower extrusion and front panel
  • Marked position of passthrough on back of cab